Restaurant Electrical Permits in Florida: What Needs One, How Long

By Joseph Myers · November 26, 2026

Request a Quick Quote

Free · No obligation · We respond same day

No spam. We respond within one business day.

Which restaurant electrical work needs a permit in Florida, who pulls it, how long review and inspection take, and how to keep it off your opening date.

Almost all of it. If the work touches a circuit, adds a circuit, moves equipment that is hardwired, changes the service, or installs a generator, it needs an electrical permit from the city or county where the restaurant sits. The only things that generally skip the permit are true like-for-like repairs: swapping a failed receptacle, replacing a light fixture on the same box, resetting a tripped breaker. Everything a restaurant build-out or remodel actually involves is permitted work, and the permit is pulled by the licensed contractor, not the tenant and not the landlord.

Timing is the part most owners underestimate. The permit itself is not the slow step. Plan review, scheduling inspections around your other trades, and the final sign-off that feeds your certificate of occupancy are where weeks go. Here is how we walk restaurant clients through it across both of our service areas, from Boca Raton and West Palm Beach down in Palm Beach County to Melbourne and Palm Bay on the Space Coast.

What actually needs a permit in a restaurant

We get asked this constantly, usually by someone who has already signed a lease and is hoping the answer is "not much." In practice, plan on a permit for:

  • Any new circuit, whether it feeds a reach-in cooler, a POS station, or a dedicated receptacle behind the bar.
  • Hood lines and cooking equipment connections, including the shunt trip that ties the hood suppression system to the cooking power.
  • Walk-in coolers and freezers, ice machines, dish machines, and anything else that is hardwired or on a dedicated circuit.
  • Panel changes, subpanels, and any work on the service itself.
  • Exterior and signage circuits, parking lot lighting, and patio power.
  • Standby generators and transfer switches. Generator installs usually pull both an electrical permit and a mechanical or gas permit, and sometimes a separate zoning review for the pad location.

The tenant improvement permit for the overall build-out does not cover this on its own. Electrical is its own permit under the master, and the inspector who signs off on electrical is usually a different person from the building inspector.

Who pulls it and what has to be submitted

In Florida, the electrical permit is pulled under a licensed electrical contractor's license number. That matters for two reasons. First, the contractor is the one on the hook for the work passing inspection. Second, if someone offers to do the job without a permit, you are the one holding an unpermitted kitchen when the fire marshal or health inspector shows up, and that can stall your opening outright.

What goes in with the application varies by jurisdiction, but a restaurant job typically needs:

  • An electrical plan showing circuits, panel schedules, and equipment locations. For a full build-out, this is usually part of a sealed set from an engineer. For a smaller remodel, a contractor-prepared drawing is often enough.
  • A load calculation when the service is changing or when the equipment list is large enough to question whether the existing service can carry it.
  • The equipment schedule with nameplate data. We ask for cut sheets on every piece of cooking and refrigeration gear before we submit, because inspectors will compare what is installed to what was approved.
  • Contractor license and insurance on file with that building department. If we have not pulled a permit in a particular city before, that registration step can add a few days.

In Palm Beach County, each municipality runs its own building department, so a job in Delray Beach goes through Delray, not the county. Brevard works similarly, with Melbourne, Palm Bay, and Cocoa each handling their own permits and the county covering unincorporated areas like parts of Viera.

How long it takes, and what controls the clock

There is no single answer, so we break it into the three stages that actually consume time.

Plan review

Minor electrical work (a few added circuits in an existing restaurant) can often be issued over the counter or within a few business days. A full build-out with a sealed drawing set goes into formal review, and that review is tied to the master building permit. Expect it to take weeks rather than days, and expect at least one round of comments. Most of the comments we see on restaurant electrical are about load calculations, hood and suppression interlocks, and GFCI protection in the kitchen.

Rough and final inspections

Once the permit is issued, the work moves in two visits at minimum: a rough inspection before walls close and a final once equipment is set and energized. Each inspection has to be requested, and the lead time depends on how busy that department is. The trap for restaurants is sequencing. The electrical rough has to pass before drywall. The electrical final generally cannot happen until the hood is installed and the suppression company has tied in. If any one trade slips, the electrical inspection slips with it, and the certificate of occupancy waits on all of them.

Utility coordination

If the service is being upgraded or a new meter is being set, FPL has its own timeline that runs separately from the building department. On a service upgrade, this is often the longest lead item on the whole job. We start that conversation the week the lease is signed, not the week the kitchen is ready.

Hurricane season adds its own variable. After a storm, building departments in coastal cities are buried in repair permits and inspection requests, and a routine restaurant final can get pushed. If you are targeting a late-summer opening anywhere from Jupiter to Rockledge, build slack into the schedule.

What to ask your contractor before signing

  • Who pulls the permit, and under whose license? The answer should be the contractor's.
  • Is plan review and inspection time included in the schedule, or is the quoted timeline just install days?
  • Who handles the FPL request if the service is changing?
  • Does the quote include the permit and inspection fees, or are those billed separately?
  • How will the electrical final be coordinated with the hood and suppression contractor?

Permit fees themselves are set by each municipality and vary by job value and jurisdiction, so we list them as a line item rather than burying them. Our restaurant electrical work includes handling the permit, plan submittal, and inspection scheduling, and it is the same process on every commercial electrical job we take on in either county.

If you are planning a build-out or remodel and want a realistic permit and inspection timeline before you commit to an opening date, we offer free, no-obligation quotes. Call (844) 432-2262 or reach out through the site, and we respond within one business day.

Frequently Asked Questions

Can I open a restaurant in Florida without an electrical permit?

No. The certificate of occupancy depends on a passed electrical final, and the fire marshal and health department will both check for it. Unpermitted work discovered later typically has to be opened up, inspected, and sometimes redone.

Does the landlord's tenant improvement permit cover my electrical work?

Not on its own. Electrical is a separate sub-permit pulled by a licensed electrical contractor, even when it runs under a master building permit for the build-out.

How far ahead should I start the electrical permit?

As early as you have an equipment list and a floor plan. Plan review, inspection scheduling, and any utility work all run on their own clocks, and starting the permit after construction begins is the most common reason restaurant openings slip.